Concrete slab to aid the cross decking for Eurostar

Work carried out at Leyton, East London.

This project required a concrete slab to aid the cross decking of a loco tug across all three lines within the Eurostar depot. The operating tolerances of the tug meant the slab had to be laid with great precision ensuring the travel across tracks was seamless. Great care, attention and time is applied to the preparation works prior to the slab being poured.

leyton worksite for eurostar depot

 

Once the concrete has been poured and the slab has had time to cure the surface is power-towelled to a high quality finish.

leyton worksite for eurostar depot

 

Nearing completion the concrete slab to enable smooth transition of the loco tug from line to line.

leyton worksite for eurostar depot

 

For more details please contact our office on 01684 278022